DariasLogistics Corp
التسعير والتشغيل، 24 ساعةquotes@dariaslogistics.comإرسال طلب

Will it fit

Will it fit: container sizing tool and door openings

Type the size of one piece or one pallet: which container takes it, which door it clears, and how many fit on the floor and stacked. It runs in your browser.

Put in the dimensions of the machine and it tells you which containers take it, which door it clears and by how much, and how many inches would open up a cheaper box. Nothing is sent anywhere: it runs in your browser.

One thing decides most of these and almost everybody gets it backwards. Compare your load against the DOOR opening, not the interior. A 40ft high cube is 106in tall inside and 101.5in at the door, and it is the door your machine has to pass through.

It goes in a box. No flat rack, no out of gauge handling, and no crate for sea exposure, because a closed container is the weather protection.

Take 8in off the height and a 20ft standard opens up, which is cheaper and easier to source. On a machine tool that is often a travelling head parked at the bottom of its stroke rather than the top.

19′ 10.5″9′ 6″Side3.8″ over8′Door end
20ft high cube · 3.8in over the load
ContainerDoor openingThis machine
45ft high cube, 102in wide98″ × 107″Fits, 9in over
20ft high cube92″ × 101.75″Fits, 3.8in over
40ft high cube92″ × 101.5″Fits, 3.5in over
45ft high cube92″ × 101″Fits, 3in over
40ft high cube reefer reefer89″ × 94″Too tall by 4in
Open toploads from the topToo tall by 6in
20ft standard92″ × 90″Too tall by 8in
40ft standard92″ × 89.5″Too tall by 8.5in
20ft reefer reefer89″ × 84″Too tall by 14in
40ft reefer reefer89″ × 84″Too tall by 14in

Measured against door openings, not interiors, and assuming the load goes in upright on its own base. Availability is a separate question: a 45ft wide box is common on the Caribbean and Latin America services out of Miami and rare elsewhere. Send us the numbers and we will tell you what is actually callable on your lane.

On weight, the number that binds you is the road one, not the box's plate. A container may be rated to carry 56,000lb or more at sea, while a US road move is capped at 80,000lb for the whole combination, so once a tractor, a chassis and the container's own empty weight are paid for, the legal cargo is commonly in the low forties of thousands of pounds. Rows marked carrier published are the shipping line's own highway figures. Rows marked our arithmetic are 80,000lb less a tractor, a chassis and the tare, and a lighter day cab or a lightweight chassis buys some of it back.

The road figures here are the published ones, not arithmetic on a guessed tractor: the Florida road table and the ocean carriers' OCEMA guideline for the dry boxes, Crowley's equipment specifications for the 45s and the reefers. A 40 ft dry box takes 44,000 lb of cargo on a standard chassis, a 45 about 41,700, a 40 ft reefer about 40,000, and a 20 stops at 38,000 unless it rides a tri-axle. Over those numbers the load is a permitted overweight move, not an illegal one.

The 20ft figures are published rather than calculated, and that is deliberate. A 20 is not stopped by gross weight: loaded to 38,000lb the whole combination weighs about 66,000, well under the limit. What stops it is the bridge formula, which cares how tightly weight is packed into a length of road, and a tractor with a 20ft chassis puts four axles into about 22 feet. Subtracting your way to a 20ft answer returns roughly 52,000lb and would be illegal by a wide margin, so we use carriers own published numbers instead. A tri-axle takes a 20 to about 44,000lb. If your 20 is heavy, call before it is loaded rather than after.

There is an escape hatch for the longer boxes. Florida issues a sealed container permit allowing up to 100,000lb gross on named routes, provided the container keeps its original unbroken seal throughout, and for freight a few thousand pounds over it often beats a second container. Check the conditions first: five load bearing axles minimum and an outer bridge of 51 feet or more. A tractor and a 20ft chassis measure around 37 to 40 feet, so a 20 does not reach it on ordinary equipment. This is a 40 and 45 instrument. One ceiling the permit prose never mentions: the chassis has its own rating, and a pool extendable is commonly rated to carry about 58,200lb of loaded container, so on a permitted 45 the chassis can stop you at roughly 47,600lb of cargo whatever the permit allows.

Whether that box is actually callable on your lane is the part this tool cannot answer. Send the numbers across and we will tell you what is running, and what it takes to get the machine into one.

Every door opening, whatever you are shipping


ContainerDoor openingInteriorRoad legal cargoPlate rating, at sea
20ft standard92″ × 90″232″ × 92″ × 94″38,000 lb 44,000 lb on a tri-axle62,350 lb
20ft high cube92″ × 101.75″232″ × 92.5″ × 106″38,000 lb 44,000 lb on a tri-axle62,000 lb
40ft standard92″ × 89.5″473.5″ × 92.5″ × 94″44,000 lb58,820 lb
40ft high cube92″ × 101.5″473.5″ × 92.5″ × 106″44,000 lb58,450 lb
45ft high cube92″ × 101″533″ × 92″ × 106″41,700 lb56,620 lb
45ft high cube, 102in wide98″ × 107″534″ × 99″ × 107″41,700 lb56,730 lb
20ft reefer89″ × 84″212″ × 89″ × 86″34,000 lb 40,000 lb on a tri-axle60,600 lb
40ft reefer89″ × 84″452″ × 89″ × 86″40,000 lb56,700 lb
40ft high cube reefer89″ × 94″452″ × 89″ × 98″40,000 lb56,620 lb
Open top92″ × 90″473″ × 92″ × 92″44,000 lb58,600 lb

Reference

What it weighs empty, and what it may legally carry


Florida legal gross is 80,000 lb for the whole combination, 34,000 lb on a tandem and 20,000 lb on a single axle, and the bridge formula ties the allowance to axle spacing. The tractor, the chassis or trailer and the empty box all come out of that 80,000 before the cargo does, which is why the empty weights matter. Over the legal figure the load is a permitted overweight move, not a forbidden one.

How much each piece of equipment weighs when it is empty
EquipmentEmpty weight, typicalWho publishes the figure
Day cab tractor, fueled15,000 to 20,000 lbno maker publishes a curb weight; scale tickets
40 ft gooseneck chassis, 2 axles6,400 lbCheetah Chassis
20 ft extendable chassis6,450 lbCheetah Chassis
20/40 ft tri-axle chassis9,350 to 9,700 lbCheetah Chassis
مسطحة10,300 lbFontaine Infinity 48 ft combo, 10,180 to 10,420
Step deck11,000 lbFontaine Infinity drop deck 10,495; Velocity steel 11,480
Lowboy17,900 lbPitts 35 ton fixed neck from 17,900; 17,000 to 24,000 by build
RGN، برقبة قابلة للفك22,500 lbTalbert 55 ton 22,510; Kalyn Siebert 21,592; 23,300 with a flip axle
Dry van13,600 lbGreat Dane 13,300; Wabash DuraPlate 13,600 to 13,900
مقطورة reefer14,500 lbUtility 3000R with unit 14,455; Great Dane Everest 15,200
Containers: the most cargo you can load and still be legal on a Florida road
ContainerWeight of the empty boxMax cargo on a normal chassisMax cargo on a tri-axle chassisMax cargo with an overweight permit
حاوية 20 قدماً4,850 lb38,000 lb44,000 lb46,000 lb
حاوية 20 قدماً high cube5,200 lb38,000 lb44,000 lb46,000 lb
حاوية 40 قدماً8,380 lb44,000 lb51,000 lb
حاوية 40 قدماً high cube8,750 lb44,000 lb51,000 lb
حاوية 45 قدماً high cube10,580 lb41,700 lb
45 قدماً high cube، بعرض 102 بوصة10,220 lb41,700 lb
Reefer مقاس 20 قدماً6,600 lb34,000 lb40,000 lb41,000 lb
Reefer مقاس 40 قدماً10,500 lb40,000 lb43,000 lb
Reefer مقاس 40 قدماً high cube10,580 lb40,000 lb43,000 lb
Open top8,600 lb44,000 lb51,000 lb
Trailers: the most cargo you can load
TrailerWeight of the empty trailerMax cargo, legal without a permit
مسطحة10,300 lb48,000 lb
Step deck11,000 lb48,000 lb
Lowboy17,900 lb80,000 lbwhat the trailer is built to carry; anything near it moves under an overweight permit with extra axles
RGN، برقبة قابلة للفك22,500 lb150,000 lbwhat the trailer is built to carry; anything near it moves under an overweight permit with extra axles
Dry van13,600 lb45,000 lb
مقطورة reefer14,500 lb44,000 lb

Container figures: the Florida road weight table published for drayage, the ocean carriers' OCEMA guideline, and Crowley's equipment specifications; box tares are nominal for the type and the real one is stencilled on the door. Trailer and chassis figures: the makers and their dealers, as named. Empty weights move by build and options, so treat them as typical and weigh the real unit when a load is close to a limit.

Why this is free

Because the answer is arithmetic and the numbers are published, so charging for it would be charging for a lookup. The work we are actually paid for starts after this: getting the box, getting the machine into it, and getting the paperwork right. If the tool tells you it fits in a dry container and saves you a flat rack and a crate, that is a good outcome for us even though it is the cheaper move.

It will also tell you plainly when the flat rack was the right call. That is not a failure, and for plenty of machines it is simply correct: the load is lifted straight down onto an open deck with nothing to squeeze past, which is gentler than threading it through a doorway.

أسئلة

إجابات مباشرة


كيف أحصل على سعر؟

أرسل الخط، والمعدة، ومقاس الحاوية، والميناء، ونرد عليك برقم. التسعير والتشغيل على مدار 24 ساعة على quotes@dariaslogistics.com.

ما الذي يشمله عرض سعر الـ drayage فعلاً؟

النقلة نفسها، إضافة إلى الرسوم الإضافية التي يفاجأ بها الناس لاحقاً: الشاسيه، والـ pre-pull، والـ per diem، والـ demurrage، والـ detention، والتخزين. نفضّل تسميتها من البداية على إضافتها إلى فاتورة.

هل يمكنني الاتصال؟

نعم. يبقى كل شيء مؤكدًا كتابةً: السعر المعروض عليك هو نفسه الموجود في بريدك، مع ذكر الرسوم الإضافية، فلا شيء يعتمد على من يتذكر ما قيل في المكالمة.

كم من الوقت تحتاجون لحجز حاوية؟

كلما كان أبكر كان أفضل، خصوصاً إذا كان الـ last free day قريباً. النقل في نفس اليوم ممكن غالباً، ويوم أو يومان يعطياننا حرية اختيار الموعد على البوابة.

ما الذي تحتاجونه مني للإفراج عن حاوية؟

رقم الحاوية، والـ bill of lading أو رقم الـ booking، والـ delivery order من الخط الملاحي أو من وكيل الشحن، والإفراج الجمركي، وعنوان التسليم مع ساعات الاستلام.

هل تعملون مع وكلاء الشحن والمخلّصين الجمركيين؟

معظم عملنا يأتي عن طريقهم. نأخذ الـ delivery order، ونتولى المحطة، ونبلّغ من يتولى التنسيق.

كم حاوية تنقلون؟

أكثر من 300 يوميًا عبر PortMiami وPort Everglades وساحات السكك الحديدية في جنوب فلوريدا، أي نحو 100,000 في السنة، أكثر من 150,000 TEU بالوحدة التي تعتمدها الموانئ. هذا الحجم هو سبب توفر الشاصي أو موعد البوابة غالبًا عندما تحتاجه حاويتك.

السعة ضيقة ولا ناقل يقبل حمولتي. هل تستطيعون؟

هذه مكالمة نحبها. أرسل الحمولة حتى لو قال الجميع الأسبوع القادم: مع أكثر من 300 حاوية يوميًا عبر الشبكة غالبًا ما توجد شاحنة، وحين لا توجد فعلاً تسمع ذلك خلال دقائق بدل الصمت. بلا عقد ولا حد أدنى للحجم؛ حمولة واحدة بسعر مكتوب، هكذا بدأت معظم علاقاتنا مع الوسطاء.

كم يستغرق رجوع السعر؟

عادةً خلال 10 دقائق، كتابيًا، في أي ساعة. المكتب الذي يسعّر نقلتك هو نفسه الذي يشغّلها، فالسعر لا ينتظر وردية الصباح أبدًا. الحمولة الفائقة أو النقلة متعددة المحطات قد تستغرق أكثر، ونقول ذلك مقدمًا بدل الصمت.

ما هو الـ last free day؟

آخر يوم يمكن أن تبقى فيه حاويتك داخل المحطة قبل أن تبدأ رسوم التخزين. إذا تجاوزته، يبدأ الـ demurrage بالتراكم يومياً، ولهذا فإن الـ pre-pull أرخص من الانتظار في أغلب الحالات.

ما هو الـ pre-pull؟

نسحب الحاوية من المحطة قبل أن تكون جاهزاً لها ونحفظها في ساحة. هذا يوقف الـ demurrage بأسعار المحطة، ويرفع الضغط عن جدول الاستلام عندك.

ما الفرق بين الـ demurrage والـ per diem والـ detention؟

ثلاثة رسوم مختلفة من جهات مختلفة. الـ demurrage هو المحطة تحاسبك على بقاء البضاعة داخل البوابة بعد المدة المجانية. الـ per diem هو الخط الملاحي يحاسبك على بقاء حاويته خارج المحطة بعد المدة المجانية. الـ detention هو وقت الناقل، ويُحتسب حين ينتظر السائق عند رصيفك بعد انتهاء النافذة المجانية. وقد تجري كلها في وقت واحد، وهكذا تصبح الفاتورة سيئة بسرعة.

ما هو الـ chassis split؟

حين لا يكون الشاسيه الذي تحتاجه في نفس موقع الحاوية، فتقوم الشاحنة برحلة إضافية لجلبه قبل أن تتمكن من السحب أصلاً. يكلّف نقلة كاملة، وهو أكثر بند مفاجئ شيوعاً في فاتورة drayage.

كيف أبقي الرسوم منخفضة؟

راقب الـ last free day، واعمل pre-pull إذا لم يكن رصيفك جاهزاً، وفرّغ بطريقة drop and pick بدل التفريغ المباشر متى أمكن، وأخبرنا مبكراً إذا تغيرت الخطط. أغلب الفواتير الكبيرة من الرسوم الإضافية سببها قرار اتُّخذ متأخراً بيوم واحد.

شركة مسجلة في ولاية Florida P20000054725تعمل منذ 2020شبكة من أكثر من 350 شاحنةشاسيه أكثر من 800مستودع أكثر من 50 رصيف تحميل