Destination
Miami to Miramar
Sits on the county line, so it can be served from either PortMiami or Port Everglades. Which one is cheaper depends on where the box actually landed.
Get a quote
Tell us the port, the box and the delivery address and we will price Miramar both ways where it is worth it.
Or email quotes@dariaslogistics.com.
Last free day today or tomorrow?
The clock runs at the port, not on the road
Demurrage starts at the terminal the day after your last free day, whether the freight is going five miles or five hundred. We pre-pull the container onto the yard first and run to Miramar when you are ready, rather than letting the box sit at the terminal earning charges while the receiver sorts out a door.
Straight through
The box goes to Miramar
Short enough that the container runs through on a chassis and comes back the same day. No handling, no second touch, and the empty is back before per diem becomes a conversation.
The run from the port to Miramar
Miramar sits right on the Broward and Miami-Dade county line, which makes it one of the few cities served naturally from either port. Port Everglades is about 15 road miles away and PortMiami is a similar run south. Which one is cheaper depends on where your box actually landed rather than on anybody's preference.
The container runs through on a chassis either way. Fifteen miles is a same day move with the empty back at the terminal before the gate closes, so there is no distance here to justify stripping the freight onto a trailer. Delivered whole, unloaded live or dropped in your yard, empty returned the same day.
Delivering in Miramar
Miramar runs a long way west in Broward County, from I-95 out past the Florida Turnpike and along Miramar Parkway toward the edge of the Everglades, and how far west your address sits changes the drive more than the county line does. The distribution buildings out west are modern and dock height. Older addresses closer to US 441 can be tighter for a 40 ft box on a chassis.
Send the container number, the steamship line, the last free day, the full delivery address and whether the unload is live or a drop, and name the port the box landed at so the pull is planned from the right gate rather than the nearer one. It is also worth saying how far west the address sits.
What runs it
Everything we run

20ft standard
20' GP / 22G1

20ft high cube
20' HC / 25G1

40ft standard
40' GP / 42G1

40ft high cube
40' HC / 45G1

45ft high cube
45' HC / L5G1

45ft high cube, 102in wide
45' HC wide body, 102in

20ft reefer
20' RF / 22R1

40ft reefer
40' RF / 42R1

40ft high cube reefer
40' RH / 45R1

Open top
20' 22U1 / 40' 42U1

Flat rack
20' / 40' FR

ISO tank
20' tank

Overweight containers
any, over legal gross

Bonded and in-bond
any, under customs bond

Flatbed
The default open deck, in 48ft and 53ft. Loads from the side, the top or the back, and anything over 8ft 6in of cargo height starts needing a permit.

Step deck
A dropped main deck buys about 18 inches of legal cargo height over a flatbed. Also called a drop deck.

Double drop
A fixed well between two raised decks, for tall freight that does not need to be driven on.

Lowboy
The lowest deck there is, for tall and heavy machines. Short well, so length is usually the constraint rather than weight.

Piggyback forklift
A rough-terrain forklift that rides on a mounting kit at the rear of the flatbed and unloads where there is no dock and no site equipment. The freight pays for it twice: in the surcharge and in the payload its weight displaces, which is why it is quoted only where it saves more than it costs.

RGN, removable gooseneck
The gooseneck detaches so the deck becomes a ramp and the machine drives on. Extendable and multi-axle versions carry the heaviest and longest loads we handle.

Stretch flatbed and step deck
Extendable decks for freight that is legal on weight but far too long, like beams, blades and pipe. The deck stretches to support the load rather than letting it overhang.

Multi-axle heavy haul
More axles under the same deck, so the weight spreads far enough to permit. This is where transformers, presses and plant equipment ride.

Conestoga
A rolling tarp on a frame, so freight loads from the side like a flatbed but travels covered like a van. No tarping crew, no weather risk.

Dry van
Enclosed, palletized freight, in 48ft and 53ft. The default for anything transloaded out of a container for an inland run.

Reefer trailer
Temperature-controlled van, in 48ft and 53ft. What a reefer container becomes when the freight transloads for an inland run.
Before it leaves Hialeah Gardens
One warehouse in Hialeah Gardens, over 50 dock doors
Everything that happens off the chassis happens here, in Hialeah Gardens, a short run from the ports, before the freight goes anywhere. Transload, cross-dock, storage, or shipping and receiving in your name. On a short lane like Miramar it is usually the answer when the receiver has no dock, rather than a cost question.
What lands on the invoice
- Chassis
- The trailer the container rides on. If it is not where the container is, that is a chassis split and an extra trip.
- Pre-pull
- Collecting the box before you are ready, to stop terminal storage running. Almost always cheaper than the demurrage it avoids.
- Demurrage
- The terminal charging you for cargo sitting inside the gate past the last free day.
The rest of it
Questions
Straight answers
Miramar is on the county line. Which port should my container come from?
Whichever one it landed at. Port Everglades and PortMiami are roughly the same distance from Miramar, about 15 road miles, and both are a same day move. The steamship line and the service decide where a vessel discharges, so this is rarely a choice made at the trucking end. Name the port along with the container number and the pull gets planned from the right gate.
Does a west Miramar address take longer than one near I-95?
A little. Miramar stretches a long way west toward the Turnpike and past it, so the last stretch of the drive adds more time than the county line suggests. It is still a same day move from either port. The compensation is that the newer buildings out west have proper docks and wide yards, which usually saves more time at the door than the extra miles cost on the road.
How long does it take to get freight from Miami to Miramar?
Same day, over roughly 15 road miles. That is the drive; the bigger variable is usually the terminal appointment at the Miami end, not the road.
Should my container go through to Miramar, or be transloaded?
Through, on this lane. It is short enough that the box goes and comes back the same day, so there is nothing to gain by handling the freight twice.
Anything particular about the Miramar lane?
Sits on the county line, so it can be served from either PortMiami or Port Everglades. Which one is cheaper depends on where the box actually landed.
Do you go beyond Florida?
Yes, all 48 states, generally transloaded to a trailer first.
What is the last free day?
The last day your container can sit inside the terminal before storage charges start. Miss it and demurrage begins accruing daily, which is why a pre-pull is almost always cheaper than waiting.
What is a pre-pull?
We collect the container from the terminal before you are ready for it and hold it on a yard. It stops demurrage running at terminal rates and it takes the pressure off your receiving schedule.
How do I get a rate?
Send the lane, the equipment, the container size and the port, and we come back with a number. Quotes and dispatch run 24 hours a day at quotes@dariaslogistics.com.
What does a drayage quote actually include?
The move itself, plus the accessorials people get surprised by later: chassis, pre-pull, per diem, demurrage, detention and storage. We would rather name them up front than add them to an invoice.